Applications for MICRO-PAM

Live Data

See how photosynthesis responds to light intensity and temperature. A MICRO-PAM system installed nearby the Walz home is sending live data via modem to a dedicated Walz server. After each saturation pulse, a complete set of data is added to the existing record. The MICRO-PAM system consists of 6 measuring heads, a data acquisition unit MONI-DA, and a modem. Choose between 3 types of graphs: Y(II) + PAR, Y(II) + ETR, or Temperature + PAR + Humidity. You can download data and display it using the software WinControl-3.


loading...
Y(II), PAR
Y(II), ETR
Temp., PAR, Hum.
Download
Ch. F Fm' Y(II) PAR 1) ETR 1) Temp. °C Air Hum. %
1) µmol m-2 s-1

 

Protocol note: September 15, 2023, 12:00 two measuring heads mounted again.
Protocol note: September 14, 2023, 08:30 two measuring heads removed for testing purposes.
Protocol note: February 14, 2023, 09:10, MICRO-HEAD #6 (MICRO-HEAD/3A) reconnected.
Protocol note: January 25, 2023, 10:20, MICRO-HEAD #6 removed for maintenance.
Protocol note: January 9, 2023, 11:20, new samples for all channels.
Protocol note: January 5, 2023, 11:40, channel 1, sample lost.
Protocol note: December 25, 2022, 11:10, channel 5, sample lost.
Protocol note: December 05, 2022, 13:30, MICRO-HEAD #6 reinstalled.
Protocol note: November 24, 2022, 13:00, MICRO-HEAD #6 removed for indoor testing.
Protocol note: January 27, 2022, 10:40, complete reset of MICRO-HEAD system.
Protocol note: December 20, 2021, 15:00, MICRO-HEAD #4 maintenance.
Protocol note: November 23, 2021, 14:00, MICRO-HEAD #8 connected (prototype with amber measuring light)
Protocol note: October 06, 2021, 14:10, MICRO-HEADs #4, and #5 reconnected.
Protocol note: September 17, 2021, 12:20, MICRO-HEADs #4, and #5 disconnected.
Protocol note: August 26, 2021, 11:30, short-pass filter added to MICRO-HEADs #2, #3, und #4. System reset.
Protocol note: July 14, 2021, 10:25, MICRO-HEAD #6 reconnected
Protocol note: July 12, 2021, 09:10, fluorescence levels of devices newly adjusted
Protocol note: July 08, 2021, 11:00, channel #6 renamed to channel #1
Protocol note: July 07, 2021, 09:50, channel #1 disconnected for maintenance
Protocol note: July 02, 2021, 17:00, channel #2 signal level trimmed down
Protocol note: June 23, 2021, 09:40, channel #2, sample change due to leaf browning.
Protocol note: June 22, 2021, 19:20, until June 23, 2021, 08:10, one sample lost due to heavy thunderstorm.
Protocol note: March 29-31, 2021, data transfer interrupted due to failure of the mobile phone network.
Protocol note: March 15, 2021, 15:00, until March 16, 2021, 09:30, communication error.
Protocol note: March 13, 2021, 13:20, until March 15, 2021, 07:40, samples lost due to storm.
Protocol note: March 11, 2021, 13:20, until March 12, 2021, 07:20, samples lost due to strong winds.
Protocol note: March 9, 2021, 13:40, new setup with 2 additional MICRO-PAM measuring heads.
Protocol note: March 3, 2021, 14:00, new plant species probed.
Protocol note: February 17, 2021, 09:10, sample changed after having noted browning of previous samples